Full Catalogue

Every pattern.
Every fitment.

Explore hundreds of specifications across our motorcycle, scooter, street, off-road, tube and specialty ranges. Filter, compare and request a quote in minutes.

Loading catalogue…
Chat with sales

Wholesale buying guide

Choose motorcycle tyres by application

Shop by market: Africa · Afrique francophone · Brasil · Sudamérica

Start with the riding environment, vehicle fitment and commercial goal—not the tread image alone. JABIL supplies motorcycle tyres, scooter tyres, off-road tyres, inner tubes and specialty fitments for distributors, fleets and private-label brands.

Street & commuter

For paved-road commuting, delivery fleets and touring. Prioritise wet grip, even wear, steering stability and the size mix used by local motorcycles.

Off-road & enduro

For mud, gravel, sand and mixed terrain. Compare knob layout, self-cleaning ability, casing strength and puncture resistance.

Scooter & moped

For dense urban mobility and last-mile fleets. Confirm small-diameter fitments, tubeless demand and expected daily mileage.

Motorcycle tubes

Choose butyl or natural rubber, then specify tyre size, valve type, packaging and air-retention requirements.

ATV & specialty

For utility ATVs, quad bikes and cargo tricycles. Define terrain, axle position, target load and operating speed.

Prepare a faster RFQ

Send size, construction, quantity, destination port, certification needs, packaging and private-label requirements.

Motorcycle tyre sourcing FAQ

What is the minimum order quantity?

Standard MOQ starts from 500 pieces per size. Mixed-size or sample requirements should be confirmed with the export team because packing and production conditions vary.

Can JABIL manufacture private-label tyres?

Yes. OEM support can include sidewall branding, tread selection, labels and export packaging. Share your brand, target sizes, market and expected annual volume for feasibility review.

What information should an RFQ include?

Include tyre or tube size, pattern or application, tube-type or tubeless construction, quantity by size, destination port, required certifications, packaging and target delivery date.

What is the usual lead time?

Typical production lead time is 20–30 days per 40’HQ container after order and artwork confirmation. Final timing depends on size mix, quantity, packaging and current production schedule.

Request size list & quotation